2 visitors on line

klein1.jpg
klein2.jpg
middel3.jpg
groot1.jpg

Date & Time in Bali

CURRENT LOCAL DATE AND TIME IN BALI:

Sunday, 8th September 2024
5:02:29 pm

Previous page

A turnkey or a turnkey project (also spelled turn-key) is a type of project that is constructed so that it could be sold to a client as a completed product. This is contrasted with build to order, where the manufacturer builds an item to the client's exact specifications, or when an incomplete product is sold with the assumption that the client would complete it.

Turnkey is often used to describe a home built on the client's land ready for the client to move in. If a manufacdturer builds a "turnkey home" they frame the structure and finish the interior. Everything is completed down to the cabinets and carpet.

What is included in a Turn-key project

Design services
Pre-fabrication of all parts
Fabrication of cabinets, wardrobes, cupboards, vanities
Installation of appliances, like kitchen sinks, tabs, bath tubs, showers, etc.
Potable water and sewer lines (*)
Electrical appliances (*)
Re-assembly at client's end including foundation

(*) It is not always possible that we install plumbing and electrical cables, sockets and switches, since this depends on the local reguletions whcih often only allow a local contractor to install, however, we are allowed to prepare the plumbing and elecrtrical design which may be used by the local contractor for installation purposes.

Prefab World Bali

Reviews from Prefab World Bali

On November 7, 2013 typhoon Haiyan, known as typhoon Yolanda in the Philippines, was the second deadliest on record that hit the archipelago killing over 4,000 peoiple which we deeply regret. The system's one-minute sustained winds reached to 315 km/h (196 mph), unofficially making Haiyan the 4th most intense tropical cyclone ever observed and made it the strongest tropical cyclone to make landfall on record. Our engineering department designs our units in cyclone areas to cyclone rating and have added a 10% additional wind force to the general cyclone design codes to cope with global warming, introducing stronger cyclones in the future. Our unit A-2 sustained typhoon Haiyan and survived. This is what the owner wrote us:
"There were minor damages and the roof remained fully in tact. Your clients should know though that this house was properly designed and built with typhoons in mind. Good job Prefabworld Bali International".
Review from: Ron Catto, Philippines
Project: 50 m2 unit
Date: 21-11-2013
Rating: 5 out of 5.

Read more testimonials from Prefabworld Bali International: click here
Dear Visitor, In order to show proof and evidence that these testimonials are genuine you may send us an e-mail with a request to provide the e-mail address of the publisher of the testimonial. We will forthwith send you the information so that you can contact the person.
Read our copyrights
X

Right Click

No right click allowed