2 visitors on line

prefab-little-1.jpg
klein2.jpg
middel3.jpg
prefab-large-3.jpg

Date & Time in Bali

CURRENT LOCAL DATE AND TIME IN BALI:

Wednesday, 23rd April 2025
1:41:30 am

Previous page

WOODEN SHINGLES 

NOTE:  OUR WOODEN SHINGLES WILL NOT BE SOLD SEPARATELY OR ON BUNDLES. THEY ARE SOLELY INTENDED FOR OUR PREFAB HOUSES FOR CLIENTS WHO BUY A PREFAB HOUSE AND WANT A WOODEN SHINGLE ROOF.

 Shingle-panel-1  Shingle-panel-2 Shingle-panel-3 
Our proven hardwood shingle  panels
(6 panels connected)
  Separate shingles installed   Shingle panel system installed on a roof

ALTERNATIVE SHINGLE ROOF WITH OUR PANEL SYSTEM   

Our shingle panel roof system that replaces the Ironwood shingle system is the result of a 5-year long developing process. The shingles made from an alternative carefully selected wood species (not to be disclosed here) are allowed to be exported and are fixed onto a Bangkirai timber frame which measures only 1.70 x 0.50 mm (67 inch x 20 inch). The weight of the frame + shingles attached to it is just 12 kgs (27 lbs).   
Our system allows 2 persons to install the shingle panels one-by-one until the roof is fully covered, rather than the system whereas half or a quarter of a roof section needs to be lifted in place requiring a small crane or a jib. The seams between these large panels are often not waterproof, are damaged and/or broken. With our paneling system such is impossible while the installation is very simple. You may also order our shingles separately, without the paneling.

 Shingles p1   Shingles p2
 Installation witH with panel system       Separate shingle installation  

 

Prefab World Bali

Reviews from Prefab World Bali

On November 7, 2013 typhoon Haiyan, known as typhoon Yolanda in the Philippines, was the second deadliest on record that hit the archipelago killing over 4,000 peoiple which we deeply regret. The system's one-minute sustained winds reached to 315 km/h (196 mph), unofficially making Haiyan the 4th most intense tropical cyclone ever observed and made it the strongest tropical cyclone to make landfall on record. Our engineering department designs our units in cyclone areas to cyclone rating and have added a 10% additional wind force to the general cyclone design codes to cope with global warming, introducing stronger cyclones in the future. Our unit A-2 sustained typhoon Haiyan and survived. This is what the owner wrote us:
"There were minor damages and the roof remained fully in tact. Your clients should know though that this house was properly designed and built with typhoons in mind. Good job Prefabworld Bali International".
Review from: Ron Catto, Philippines
Project: 50 m2 unit
Date: 21-11-2013
Rating: 5 out of 5.

Read more testimonials from Prefabworld Bali International: click here
Dear Visitor, In order to show proof and evidence that these testimonials are genuine you may send us an e-mail with a request to provide the e-mail address of the publisher of the testimonial. We will forthwith send you the information so that you can contact the person.
Read our copyrights
X

Right Click

No right click allowed