2 visitors on line

klein1.jpg
klein2.jpg
middel1.jpg
groot2.jpg

Date & Time in Bali

CURRENT LOCAL DATE AND TIME IN BALI:

Thursday, 21st September 2023
9:51:04 am

Previous page

NOTE: The article below is solely intended for our visitors who wish to buy one of our prefabricated houses. We do not sell the windows separately 

All of our windows are made from properly kiln dried genuine tropical Camphor hardwood. On special request we may use different materials such as Bangkirai, Merbau, Teak, Mahogany or Meranti.

Standard thickness of rails and stiles is 35 mm (1 3/8").

 

STANDARD SLIDING WINDOW GEAR WITH RAIL SYSTEM

Sliding-door-gear-1  Sliding-door-gear-2  Sliding-door-gear-4
Rail and roller system for a single sliding window  Rail and roller system for a single sliding window Rail and roller system for a triple stacked sliding window

 

 Sliding-door-gear-5  Sliding-door-gear-6 Sliding-door-gear-7 
Rail and roller system for a doublel sliding window Tracking rails for a triple stacked sliding window Track device for a single sliding window  


WINDOWS OPTIONS 

SW-1 SW-2 SW-3a SW-4 SW-5 SW-6
SW-1 SW-2 SW-3 SW-4 SW-5 SW-6

  

SW-7 SW-8 SW-9  SW-10
 SW-7 SW-8 SW-9 SW-10

 

SW-11

SW-12 SW-13 SW-14
 SW-11 SW-12 SW-13 SW-14

 

SW-15a   SW-16a    
 SW-15 SW-16 SW-17 SW-18

 
We also produce sliding doors in accordance with your own design or picture.

 

Prefab World Bali

Reviews from Prefab World Bali

"I am the project leader for the development of some large houses to be constructed on the island of Kauai. I have thoroughly investigated the option of builing on site versus purhasing the pre-fab home from Baliprefabworld. I am convinced that working with Baliprefabworld is the most economical, efficient and effective way to go. The beauty and aesthetics of these homes are truly wonderful. We are planning to work with Baliprefabworld to use a variety of their standard models to design the home we want. The professionalism, quality of materials, and design capacity of Baliprefabworld is exemplary".
Review from: Steven Ott, Berkeley, USA
Project: Resort for Kauai, Hawaii
Date: 08-10-2014
Rating: 5 out of 5.

Read more testimonials from Prefabworld Bali International: click here
Dear Visitor, In order to show proof and evidence that these testimonials are genuine you may send us an e-mail with a request to provide the e-mail address of the publisher of the testimonial. We will forthwith send you the information so that you can contact the person.
Read our copyrights
X

Right Click

No right click allowed