2 visitors on line

prefab-little-1.jpg
klein2.jpg
middel2.jpg
groot1.jpg

Previous page

PROJECTS COMPLETED ON THE ISLAND OF ST. MARTIN (DUTCH PART)


DESIGN PROJECT 

Caribbean-1  Caribbean-2 Caribbean-3
Villa to be built on the island of St. Maarten  Interior of Villa for St. Maarten  Semi detached villa at St. Maarten 

 

Caribbean-4 Caribbean-5 Raflesia p3
 Gazebo St. Maarten Villa built on the island of St. Maarten Villa built on the island of
St. Maarten (Caribbean)
(This unit survived hurricane Irma, September 2017)

 

SUN DECK + POOL WITH INFINITE EDGE + SPA+ DINING AND RELAX SPACE ON TOP OF A 3-STOREY APPARTMENT
 
MR. CHARLIE DAHAN
 
 St-Martin-01 St-Martin-02  St-Martin-03 
Artist impression

Artist impression

Artist impression


DESIGN FOR A SMALL RESOT.
MR. CHARLIE DAHAN

Caribbean-12    
Small resort development for the island of St. Maarten     

 

 DESIGN FOR THE ISLAND OF ST. MAARTEN (DUTCH CARIBBEAN), MODEL  BUNGA PADMA

 Bunga Padma floor plan level 0 Bunga Padma floor plan level 1  Bunga Padma front elevation 
Floor plan level 0
(Top level)
Floor plan level 1 
(Bottom level)

Front elevation 

Bunga Padma left side elevation  Bunga Padma right side elevation  Bunga Padma rear elevation 1
Left side elevation  Right side elevation   Rear elevation

 

 Bunga Padma 1  Bunga Padma 2 Bunga Padma 3 
Front elevation   Right side elevation

Left  side elevation 

 Bunga Padma 4  Bunga Padma 5  
Front/right side ellevation  Front elevation   

 

Prefab World Bali

Reviews from Prefab World Bali

Prefabworld Bali International is doing an excellent job of modeling the 3-D finite element frame structure in STAAD and now analyzing the individual members to ensure that they are not overstressed. I have just completed a review of the column analysis for the primary columns supporting the roof, and it is well presented and clearly shows the members are of adequate size. I have not seen anything like this the before the way this report was presented and prepared with the vast knowledge behind. It was that excellent. This type of analysis would not have been possible by hand calculation because of the complexity of the structures. Excellent job by Prefabworld Bali International.
 
Review from: Professor Ian Robertson, University of Hawaii
Project: 400 m2 dwelling for Maui, 50 m2 and 110 m2 dwelling for the big island. 
Date: 2012. 2016, 2020, respectivelyy
Rating: 5 out of 5.
 
Dear Visitor, In order to show proof and evidence that these testimonials are genuine you may send us an e-mail with a request to provide the e-mail address of the publisher of the testimonial. We will forthwith send you the information so that you can contact the person.
Read our copyrights
X

Right Click

No right click allowed