Prefabworld Bali discounts and special arrangements for ita wooden knock down houses 

Want to build your unit in Bali? Provided you agree with our conditions as outlined below we offer a discount and some special arrangements. 

MAIN CONDITION
We will not pre-assemble at our yard but will directly build at your land

Situation A: The unit to be built on client’s land having an house built on it, whether or not occupied by client
• The workers to be allowed to stay overnight at client’s end (we will erect a very small and simple temporary dormitory on a spot not disturbing the client)
• Unrestricted access at all times to the worker’s facilities, except under certain conditions enforced by client
• Accept the sound from drilling, hand plaining machines and other small gear during working hours
• The workers to be allowed to do their daily cooking (with gas)
• Electricity during the assembly to be provided and paid for by client
• Temporary connection to client’s water supply connection for the worker’s bathing and toilet requirements
• Temporary connection from the dormitory bathing facilities to client’s wastewater septic system
• Allowing to have a TV running at the worker’s dormitory
• Client shall not interfere with the workers while carrying out their duties and/or give instructions related to the re-assembly of the unit(s)
• Cost for a KIPEM to be borne by client (KIPEM is the locally monthly required fee for allowing the workers to work and/or stay overnight in the local community. i.e Banjar)

Total discount: 5%

Situation B: The unit to be built at client’s land not yet having any facility (empty land)

• The workers to be allowed to stay overnight at client’s land (we will erect a very small and simple temporary dormitory)
• The workers to be allowed to do their daily cooking (with gas)
• We will apply for a temporary electricity connection with PLN. The application costs to be borne by client (*)
• The cost for the use of electricity to be borne by client
• We drill a water source to a certain depth to reach fresh and clean water. The water will be pure and potable and can be used for own purposes after the prefab unit has been built. The cost for the          drilling and the installation of the water pipes to be borne by client.
• 2 options for the wastewater system:
   B-1: We dig a temporary disposal pit for the wastewater. After the completion of the project the pit to be filled with absorbing limestone gravel and covered with soil.
   B-2: We build a septic tank which can later be used for client’s own wastewater system
• Allowing to have a TV running at the worker’s dormitory
• Client shall not interfere with the workers while carrying out their duties and/or give instructions related to the re-assembly of the unit(s)
• Cost for a KIPEM to be borne by client (KIPEM is the locally monthly required fee for allowing the workers to work and/or stay overnight in the local community, i.e Banjar)

Total discount 3%

(*) Can be changed into a permanent connection, the power supply increased if required and utilized for own purposes after the prefab unit has been built

Prefab World Bali

Reviews from Prefab World Bali

On November 7, 2013 typhoon Haiyan, known as typhoon Yolanda in the Philippines, was the second deadliest on record that hit the archipelago killing over 4,000 peoiple which we deeply regret. The system's one-minute sustained winds reached to 315 km/h (196 mph), unofficially making Haiyan the 4th most intense tropical cyclone ever observed and made it the strongest tropical cyclone to make landfall on record. Our engineering department designs our units in cyclone areas to cyclone rating and have added a 10% additional wind force to the general cyclone design codes to cope with global warming, introducing stronger cyclones in the future. Our unit A-2 sustained typhoon Haiyan and survived. This is what the owner wrote us:
"There were minor damages and the roof remained fully in tact. Your clients should know though that this house was properly designed and built with typhoons in mind. Good job Prefabworld Bali International".
Review from: Ron Catto, Philippines
Project: 50 m2 unit
Date: 21-11-2013
Rating: 5 out of 5.

Read more testimonials from Prefabworld Bali International: click here
Dear Visitor, In order to show proof and evidence that these testimonials are genuine you may send us an e-mail with a request to provide the e-mail address of the publisher of the testimonial. We will forthwith send you the information so that you can contact the person.
Read our copyrights
X

Right Click

No right click allowed